• Home
  • About Us
  • WHAT WE DO
    • PILING WORK
    • MICRO PILING (MINI)
    • SOIL & ROCK ANCHOR
    • FABRICATION
    • GROUTING & GUNITING
    • EXCAVATIONS
    • SOIL NAILING
    • OTHER TECHNIQUES
  • GALLERY
  • CLIENTS
  • CONTACT US
  • More
    • Home
    • About Us
    • WHAT WE DO
      • PILING WORK
      • MICRO PILING (MINI)
      • SOIL & ROCK ANCHOR
      • FABRICATION
      • GROUTING & GUNITING
      • EXCAVATIONS
      • SOIL NAILING
      • OTHER TECHNIQUES
    • GALLERY
    • CLIENTS
    • CONTACT US
  • Home
  • About Us
  • WHAT WE DO
    • PILING WORK
    • MICRO PILING (MINI)
    • SOIL & ROCK ANCHOR
    • FABRICATION
    • GROUTING & GUNITING
    • EXCAVATIONS
    • SOIL NAILING
    • OTHER TECHNIQUES
  • GALLERY
  • CLIENTS
  • CONTACT US

Excavations

 

Introduction

In construction Terms, excavation is the process of removing earth to form a cavity in the ground. On small sites or in confined spaces, excavation ,may be carried out by manual means using tools such as picks, shovels & wheelbarrows. Largescale excavation works will require heavy plant such as multipurpose excavator, poclain & bulldozers.

Excavation may be classified as follows:

  • Topsoil excavation
  • Earth excavation
  • Rock excavation
  • Muck excavation
  • Trench excavation Basement excavation
  • Basement excavation

Generally, the choice of excavating plant will depend on:

  • The quantity of material to be excavated.
  • The type of condition of the soil
  • The weather conditions
  • The speed of excavation required
  • The depth of the excavation
  • The material disposal method (side cast or cart away)

Excavation support

Materials have different stability characteristics during excavation works. The ‘angle of repose’ of the material describes the steepest angle at which it will remain stable without support.

The exact angle of repose will depend on the presence of groundwater, but some typical angles are:

  • Drained clay: 45-degrees.
  • Wet clay: 16-degrees.
  • Gravel and dry sand: 40-degrees.
  • Wet sand: 22-degrees.

The type and extent of temporary support that is required will depend on the following factors:

  • The stability and angle of repose of the subsoil.
  • The proximity of the excavation to vehicles, services and buildings.
  • The level of the water table.
  • The type/s of subsoil.
  • The depth of the excavation.
  • The length of time the excavation will be left open.
  • The time of year and weather conditions.

Copyright © 2024 Sneha Geo Engineering - All Rights Reserved.

Powered by GoDaddy

  • About Us
  • PILING WORK
  • CONTACT US

WELCOME

CORE STRENGTH, FUTURE STABILITY

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept